CONSTRUCTION
TOURS Available to Pastors, Mission Groups and Civic Clubs. Call our office, CKPM, 316-733-1537
VIDEO Clips of the main chapel area. This is the 300 seat auditoium
#1 - ENTRY: This video clip is as you enter the auditorium and looking toward the stage front area.
#2 - STAGE: This video clip is as you are standing in the front, looking toward the entry and back.


The Above picture is from outside looking through the entry to the auditorium doors.
The picture below is as if a person were in the sound booth looking towards the stage.

Main chapel area where the 300 seat auditorium will be located.
Below is the reverse view of the above picture. Looking from the stage back to the audience.

Below, is a photo taken from the stage area of the Multi-purpose room, look toward the stage area.

Below left is the right-front of the of the chapel, showing the work on the ductwork.
Below right,, Architect Tim Dudte goes over the prints during the monthly inspection.
- 
- 
Hallway, looking both directions.

(L-R) Larry Crawford (CKPM Trustee) visits with EDCF contractor Tom McKee.
IT IS TAKING SHAPE. Pray for us, we need $150,000 to FINISH!!!!